Standard Building Sub-Contract with sub-contractor’s design Conditions

Standard Building Sub-Contract with sub-contractor’s design Conditions for use in Scotland (SBCSub/D/C/Scot 2016)

Appropriate:

  • for use where the main contract is the Standard Building Contract (with quantities, without quantities or with approximate quantities);
  • where the Contractor is to design discrete part(s) of the main contract works (Contractor’s Designed Portion); and
  • the Sub-Contractor is to design all or part of the sub-contract works (Sub-Contractor’s Designed Portion).

Can be used:

  • where the sub-contract works and/or main contract works are to be carried out in sections; 
  • for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete remeasurement.

Not suitable:

  • where no sub-contractor’s design is involved – consider using the Standard Building Sub-Contract (SBCSub/A/Scot and SBCSub/C/Scot).

 

Amendment and Errata Sheets

Amendment Sheet February 2018

 

Downloads

Contract front page

Standard Building Sub-Contract with sub-contractor’s design Conditions
SBC575
£82.00

Sign in

Please sign in or subscribe to purchase this contract.